CLIENT

Hong Kong Based Interior Design Firm

GOAL

Complete construction documents for suites in a major hotel in Dubai
(Presidential Suite, Executive Suite etc.)

CLIENT CHALLENGES

Client inherited confusing schematic PDF drawings from a previous design firm
PDF drawings needed to be integrated with the client’s current design
Tight deadlines and high pressure
Designers located in 2 time zones tasked with making decisions

ACTIONS

Carefully studied all drawings ensuring that design requirements were met
Maintained constant communication with clients to remain on task and on target
Skyped with US, HK and Philippine offices on a weekly basis

RESULTS

Successfully integrated design from the PDFs with the client’s design
Completed construction documentation

Close Menu